PEM Logo
 
SLAC

Procedures

Procedures

Linac

  • Sub-Booster Adjustments
  • ***NOTE: All sub-boosters are adjusted per my memo except SB-1 which has a RF amplitude pulse width of 3.4 us +/- .05.***
  • Ground_Current_Troubleshooting_and_Repair
  • PFN Tuning
  • Modulator VVS Feeder Breaker
  • Klystron modulator PFN Tuning Stick Certification Procedure
  • MKSU Procedures
  • Shunt_Trip_Board_Bench_Test
  • K2_Upgrade
  • Core Bias TSR
  • Please use this Pulse Cable Drawing and Triaxial Pulse Cable to help troubleshoot.
  • Follow this procedure Remote commands
  • when a station does not respond to any or all remote commands. The stations that got the PPS modification during the last downtime (1-7B, 1-7C, 1-8, 20-3C, 20-4A, 20-5 through 20-8) are exempt because they have an engineering deficiency that must be corrected.
  • Mod HVOC & Prim CB Trip
  • Megger Hi-Pot Procedure 8_6_09

  • EPICS

  • EPICS guide for GENESYS power supply on Test Stand
  • EPICS Genesys 300-17 SERIAL Test Stand
  • EPICS Genesys 20-38 X 4 SERIAL Test Stand
  • EPICS Genesys SERIAL Test Stand
  • SSRL

  • Low Voltage Testing of IE Power Supplies
  • Unipolar Switch Mode Intermediate DC Power Supplies

  • MCOR

  • B024 Testing Procedures for MCOR Controllers
  • MCOR2 Conversion
  • MCOR12 Calibration

  • Magnetic Measurements

  • Magenetic Measurements PPT

  • AMRF

  • R/R Sub Booster Klystron

  • NIRP

  • LCLS High Powered Klystron Operation Dec 5 2007
  • Periodic Testing of the High Powered RF Vacuum Interlock Systems

  • K13

  • Installing Solid State K6
  • CH error on the E414879x

  • Shop

  • DeQing #1 Test Procedures
  • DeQing #2 Test Procedures


  • Last Update: Tue, 10 Nov 2009 05:07:15 GMT